Project Update:

BürkertProgress to the Bürkert USA Headquarters continues, as Edifice was able to get the TPO roofing completed on the warehouse in December as well as the majority of the remaining storefront and curtain wall. The interior framing of the warehouse has been completed and the mechanical, electrical, and plumbing rough-in work continues to be placed throughout. This includes the tie-in of the FTU’s and duct insulation in the office area.

 
 
 

Bürkert
In the photo to the right, the main pipes can be seen for the 4 pipe system dropping down into the mechanical room.
 
January will kick off with an exciting start as we begin the installation of the rooftops and the start of Skylight installation.
 
The wet weather continued in regards to site-work. Between the rain events, Horsepower Site Services, was able to place the stone in prepping the loading dock area for the concrete to be poured, with the hopes of another window of dry weather, in early January.

 

Bürkert

Aerial Photography Credit: Eddie Hartman, Corporate Images