Christ Covenant Church | August 2015

Project Update:Click Here to view the live construction cam feed!

Christ Covenant Church demoThe Community Life Center at Christ Covenant Church is gearing up and the site work is underway. The modular buildings and debris has been removed from the site. The erosion control and storm sewer adjustments are being completed and grading will commence on the building pad thereafter.

 

 

Christ Covenant Church sewer lineAdditionally, the sanitary sewer pump station has been installed. The next step will be to have Duke connect power and have the force main tied-into the municipal sewer. These are critical steps that will allow us to remove the existing sanitary sewer pump station in the middle of the New High School building pad.

 

 

Monthly Photo Highlights Include:

Click on the photos below to view the full photo.

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” width=”674″ height=”406″ opacity=”70″]

Share This

Quick Links

Stay on top industry news with edifice

8 people with shovels digging in a ground breaking ceremony. Two large pieces of construction equipment are behind them. Between the equipment is a large banner with a computer rendering of the project on it.

HEYCO-Werk USA Breaks Ground on Manufacturing Facility in Gaston County

CHARLOTTE, N.C. (June 18, 2024) – HEYCO-Werk USA celebrated the start of construction of their new US manufacturing facility with...
EDIFICE Construction Ranks as a TOP General Contractor in Charleston Area

EDIFICE Construction Ranks as a TOP General Contractor in Charleston Area

We are thrilled to announce that EDIFICE Construction has achieved a remarkable milestone by securing the #8 spot in the...
Continental Tire Unveils Expanded Americas HQ in Lancaster County

Continental Tire Unveils Expanded Americas HQ in Lancaster County

Continental Tire the Americas has significantly expanded its Lancaster County headquarters operations. The tire giant yesterday unveiled its new, 90,000-square-foot...