Project Update:
The Community Life Center at Christ Covenant Church is gearing up and the site work is underway. The modular buildings and debris has been removed from the site. The erosion control and storm sewer adjustments are being completed and grading will commence on the building pad thereafter.
Additionally, the sanitary sewer pump station has been installed. The next step will be to have Duke connect power and have the force main tied-into the municipal sewer. These are critical steps that will allow us to remove the existing sanitary sewer pump station in the middle of the New High School building pad.
Monthly Photo Highlights Include:
Click on the photos below to view the full photo.
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” width=”674″ height=”406″ opacity=”70″]