Christ Covenant Church | August 2015

Project Update:Click Here to view the live construction cam feed!

Christ Covenant Church demoThe Community Life Center at Christ Covenant Church is gearing up and the site work is underway. The modular buildings and debris has been removed from the site. The erosion control and storm sewer adjustments are being completed and grading will commence on the building pad thereafter.

 

 

Christ Covenant Church sewer lineAdditionally, the sanitary sewer pump station has been installed. The next step will be to have Duke connect power and have the force main tied-into the municipal sewer. These are critical steps that will allow us to remove the existing sanitary sewer pump station in the middle of the New High School building pad.

 

 

Monthly Photo Highlights Include:

Click on the photos below to view the full photo.

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” width=”674″ height=”406″ opacity=”70″]

Share This

Quick Links

In the News


Play Button Metrolina Park | August 2018

Metrolina Park | August 2018

The Metrolina Park has reached completion with buildings 1-5 successfully constructed and turned over to the owner / developer, Beacon...
The Charlotte Business Journal honors Edifice as the #1 Middle Market Leader

The Charlotte Business Journal honors Edifice as the #1 Middle Market Leader

The Charlotte Business Journal honored local middle market firms for propelling the region’s economy. In honoring these companies, the Business...
Wing_Haven

Wing Haven’s SEED Wildlife Garden Comes to Life

As a long-time supporter of Wing Haven Garden, Edifice was pleased to play a small role in bringing Wing Haven’s...