Christ Covenant Church | August 2015

Project Update:Click Here to view the live construction cam feed!

Christ Covenant Church demoThe Community Life Center at Christ Covenant Church is gearing up and the site work is underway. The modular buildings and debris has been removed from the site. The erosion control and storm sewer adjustments are being completed and grading will commence on the building pad thereafter.

 

 

Christ Covenant Church sewer lineAdditionally, the sanitary sewer pump station has been installed. The next step will be to have Duke connect power and have the force main tied-into the municipal sewer. These are critical steps that will allow us to remove the existing sanitary sewer pump station in the middle of the New High School building pad.

 

 

Monthly Photo Highlights Include:

Click on the photos below to view the full photo.

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-27-15-4.42.45-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.30-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-28-15-2.10.07-PM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.03-AM.jpg” width=”333″ height=”225″ opacity=”70″]
[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/08/Image-7-30-15-8.57.22-AM.jpg” width=”674″ height=”406″ opacity=”70″]

Share This

Quick Links

In the News


Play Button The Square at South End has reached the Top

The Square at South End has reached the Top

We’ve topped out! The Square at South End has reached a major milestone in the life of this construction project...
How COVID-19 is Impacting Charlotte’s Commercial Real Estate Market

How COVID-19 is Impacting Charlotte’s Commercial Real Estate Market

Cranes and construction crews are still largely in full swing in Charlotte, despite the earth-shattering impacts of the coronavirus pandemic...
Thank you field Personnel

Thank you EDIFICE Field Personnel

Your courage and dedication during COVID-19 goes above and beyond.   In our community, construction has been considered an essential...