Construction Highlights Last 30 Days: CFCC

  • Poured Site Footing/Walls North Side
  • Metal Coping Installation
  • ACM Panel Installed at Lobby Overhang
  • Hanging Balcony Ceilings on Level 01/02
  • Hanging Hard Ceilings in Areas A/B/C
  • Ceramic Tile Installed in Bathrooms B/C
  • Louver Installation
  • Started Above Ceiling Inspections in ACT ceilings
  • Loading Dock Equipment Installed
  • Roll Up Coiling Doors Installed