The 25,128 square-feet, two-story classroom addition has a seamless flow between it and the existing building. The addition allows the school to increase the number of students it can serve from 300 to 500 students. The Phase II building added traditional classroom spaces, 2 science labs, a cafeteria and extracurricular spaces such as an art classroom, a drama/band classroom, a shop classroom.
“…You see them (Edifice) all over Charlotte and there is a reason they are as big and great as they are, because they do big things and great things with great attention to detail. And they were very sensitive to the needs of the students here. They changed their plans many a times so that you guys (students) can keep learning.”
Dr. Carl A. Semmler, Head of School
Christ the King Catholic High School
Christ the King High School located in Huntersville, North Carolina hosted Most Reverend Peter Jugis, Bishop of Charlotte as he…