Christ Covenant Church | September 2015

Project Update:Click Here to view the live construction cam feed! Christ Covenant Church

Good progress has been made over the last few weeks with the Christ Covenant’s Community Life Center. After excavation of the hillside, we began installation of the french drains around the lower level and tied into the storm sewer. Simultaneously, we have begun the lower level foundation. We poured about 150 cu yd of footings last week and have started erecting formwork for the 15 foot high retaining walls. Footing construction will continue and the walls will chase them around the perimeter. Our goal is to complete the lower level in less than 4 weeks. The rough-in work for plumbing and electrical will begin in the next few weeks.

Christ Covenant Church Monthly Photo Highlights:

Click on the photos below to view the full photo.

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-9-15-1.07.12-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-9-15-1.07.12-PM.jpg” alt=”Christ Covenant Church” width=”670″ height=”503″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/IMG_3682.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/IMG_3682.jpg” alt=”Christ Covenant Church” width=”333″ height=”222″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-8-27-15-11.21.50-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-8-27-15-11.21.50-AM.jpg” alt=”Christ Covenant Church” width=”333″ height=”222″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-8-15-12.40.49-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-8-15-12.40.49-PM.jpg” alt=”Christ Covenant Church” width=”466″ height=”300″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/IMG_1615.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/IMG_1615.jpg” alt=”Christ Covenant Church” width=”200″ height=”300″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-14-15-7.45.38-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-14-15-7.45.38-AM.jpg” alt=”Christ Covenant Church” width=”200″ height=”300″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-8-15-12.46.02-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-8-15-12.46.02-PM.jpg” alt=”Christ Covenant Church” width=”466″ height=”300″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-9-15-9.48.36-AM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-9-9-15-9.48.36-AM.jpg” alt=”Christ Covenant Church” width=”466″ height=”300″ opacity=”70″]

[hover_pack img=”https://edificeinc.com/wp-content/uploads/2015/09/Image-8-27-15-3.05.04-PM.jpg” link=”https://edificeinc.com/wp-content/uploads/2015/09/Image-8-27-15-3.05.04-PM.jpg” alt=”Christ Covenant Church” width=”200″ height=”300″ opacity=”70″]

Share This

Quick Links

In the News


Play Button The Square at South End | September 2020

The Square at South End | September 2020

The Square at South End continues to impress. The parking deck structure is complete and the site cleared around it...
St. Joseph College Seminary in Mount Holly named General Contractor Project of the Year

St. Joseph College Seminary in Mount Holly named General Contractor Project of the Year

The Associated Builders and Contractors of the Carolinas (ABCC) announced that the 2020 GC Project of the Year, presented by Adams...
Supporting the Salvation Army Angel Tree Project

Supporting the Salvation Army Angel Tree Project

EDIFICE employees once again stepped up to bring a little holiday cheer to our smallest neighbors in need. Employees pitched in...