Author Archive

Pee Dee Spec Building (Johnson Controls)

This large industrial warehouse includes a total of 315,000-square foot and was constructed using tilt-up concrete panels with a 6” floor slab and multiple dock doors with levelers. The facility utilizes fluorescent hi-bay lighting.

Signature Distribution Buildings I & II

This project consisted of two separate industrial distribution facilities totaling nearly 400,000-square feet and constructed utilizing tilt-up concrete panels.

North Rhett IV

Charleston, South Carolina ABOUT This industrial facility is a 315,000-square foot tilt-up construction for distribution and warehousing. Designed with 41…

Aquesta Bank Corporate Headquarters & Retail Banking Center

This projects consists of a 19,500-square foot, three-story corporate headquarters and retail banking center. The corporate headquarters includes Class ‘A’ administrative and corporate office space and conference rooms.  The retail banking area includes drive-up teller.

WSOC-TV

This phased construction build out 5,000-square foot of renovations to the Broadcasting and Production studios.

Johnston Allison Hord Attorneys

Charlotte, NC ABOUT The project consisted of 7,500-square-foot of Class A office upfit, including an initial demolition of existing space….

Aptar

The renovation converted the existing 237,000-square foot warehouse to a manufacturing facility for plastic moldings. The work included the coordination of a 235 tons HVAC unit.

Park Avenue / Infinity Broadcasting

Charlotte, North Carolina ABOUT This project consisted of a 90,000-square-foot, three story mixed use, urban facility constructed of structural steel…

United Plate Glass

The 55,000-square foot facility is a manufacturing and distributing center designated for tempered glass. The project utilized tilt-up concrete and provided a fast-track, lower cost solution without compromising the durability or architectural appeal of the building.

PreGel America Corporate Headquarters / Manufacturing Facility

This work on this campus involves 2 separate buildings for a total of 238,000-square foot. The initial construction included a 3-story, 135,000-square foot corporate headquarters with 9,900-square foot for training, office / meeting spaces, distribution, manufacturing. An upfit to the third floor included six (6) residential units.